Among the highlights:
 A new, unified terminal that will be 600 feet closer to the Grand Central Parkway, providing 240 percent more space to runways and flight operations.
High-speed ferry service that will have boats docking at the existing Marine Terminal.
 Passenger access to their gates via raised pedestrian bridges, high enough for aircraft to taxi underneath.
A state-of-the-art, post 9/11 security system that will be three times as large as the current operation, slashing wait times.
Nearby roads re-configured to improve access for passengers and reduce traffic.
A new Central Hall with increased space for high-end amenities including retail shops and a 200-room boutique hotel.
An increase in passengers from roughly 27 million in 2014 to 35 million when its finished.