I heard from Walt and he said it will be a split order, 150 Boeing B737-923ER back by Boeing through BCC for 20 yrs lease. 150 Airbus A321-214 back by Airbus through AFS for 20 yrs lease. the deliveries are to be around 50 frames each per year each starting Jan 01, 2012. Both Boeing and Airbus will be giving AMR a line of credit and DIP if needed and a agreement at All 300 Boeing and Airbus aircraft in this order will remain with AA operation or what ever AMR decide to do to their operation and Boeing will agree that All Boeing 737-823 will remain with AA operation or what ever AMR decide to do to their operation if a Pre-package BK is needed. AMR is trying to get Boeing and Airbus to work with GE/CFM to get them on board with the CFM56 engines to protect these new Boeing/ Airbus order aircraft engines along with the current Boeing B737-823 engines and spares engines. either with a line of credit, a DIP, or a power by hour agreement or a combine mega agreement with all three with GE/CFM. AMR is re-questing that Boeing and Airbus be their sole parts and spare parts provider, etc. APUs, electrical control boxes, FMC,ADRIU, etc. computers, hydraulic pumps, window and windshields, pneumatic air valves, fuel pumps, flight control actuator, landing gears and /or components, if a Pre-package BK is needed.