Nobody seems to have a clear cut answer on this, so I''ll pose it to this board:
Is MDA considered an addition to the mainline fleet of 279 aircraft and therefore NOT included in the overall scope relief for RJ''s, or is it part of the 465 RJ aircraft scope restriction?
Thanks
Is MDA considered an addition to the mainline fleet of 279 aircraft and therefore NOT included in the overall scope relief for RJ''s, or is it part of the 465 RJ aircraft scope restriction?
Thanks