For those of you posting concerns about the exterior appearance of our aircraft, we are starting up the paint tracks again. There will be one track initally with a second track to be added later.
The first aircraft will be a 737-300, a/c 523 scheduled to ferry to ARA on June 16th. The
737-300/400 fleet will be done first. The widebodys will not be scheduled until the fall with the seasonal reduction in international flights. The painting will be done in New Ibera, LA.
The first aircraft will be a 737-300, a/c 523 scheduled to ferry to ARA on June 16th. The
737-300/400 fleet will be done first. The widebodys will not be scheduled until the fall with the seasonal reduction in international flights. The painting will be done in New Ibera, LA.