I just do not see a "Yes" vote from any of the contracts on the property,mostly due to the 2003 concession's package,AMR is just wasting their time.I see no one except those who feel that AMR deserve's a break to vote "yes ".I would rather vote it down only within a matter of days AMR seeks relief.One must imagine that all work group's will be looking at something soon as to time this with Judge Lane to amend all contracts all at once as to set in motion a LLC within the company for domestic routes.With a cost struture domesticly down (with stripped contracts), they then fly A319-A320, and 737's with a much lower/or even employee cost than say Jet Blue or right at employee cost structure of Southwest 1-2 year employee on the property.Mind you this cut in benefits would be deep for a employee at AA. Also one just needs to look at the stat's in the employee reduction in head count over the years at UAL, DAL. Massive to say the least. These banks that will be involved in the restructuring will demand high performance goals to meet or exceed each quarter so as soon as they exit the heat will be on,or they end up back in court seeking more relief with another BK filing. I feel AMR should have done this long ago,they have much to do,with such a huge pressure on them in a rather stagnat enconomy,and the EU looking only worst, this could hurt their earnings report,speaking of reports whatta guess what their loss will be for 2011,ouch. Hang on to your life vest,this ride could skip the water before it heads for higher attutide,and smoother flying.