Flying low
Veteran
- Jul 19, 2011
- 629
- 232
Get rid of tulsa and outsource it, then when the line doesn't conform, outsource them to. Once tulsa is gone, can you imagine how much line work can be outsourced and stay within the 35% limit?Now why would AA want to oursource 100% Tulsa when 74% of the stupidity is here and votes in their lousy contracts? I wouldn't if I was Horton and company. If Tulsa is not here to vote yes then the chances of more give backs are slim and none.